Water Restoration Update 12.26.22
- Martha Dobson
- Dec 26, 2022
- 1 min read
As of mid-afternoon, there are comments on the CHOA WhatsApp group that RPB Systems, the water management company, has gotten the well restarted.
It will take 2-8 or more hours for all homes to get water. It will get to homes at lower elevations before the ones at higher elevations. Double Knob and the Trailhead Way areas will be last.
If Lucas saw that a house looked unoccupied, he attempted to turn off its water at the street. He marked the water taps he looked at with pink flags. One pink flag means it looked ok; 2 pink flags mean there was an issue at the box. If there isn’t a pink flag, Lucas didn’t do anything at that tap.



